Building
Future
Communities
Together
Smarter
Beyond
Project Name
Due Date
Description
Action
Thales Palladium
Active
2025-04-09
4 days remaining
Thales is looking to consolidate its footprint in Ottawa where it currently has three leases across two addresses, Thales has leased 500 Palladium Dr. for this purpose. Thales is intending to complete tenant improvements of the new space improving the facilities for all of Thales employees in the National Capital region. The general contractor will conduct fit-out will comprise of demolition, engineered structure re-enforcements, partition construction, environmental upgrades, supply of all materials, and finishing of the 2-story floor space.
Walmart - 1068 Peace River Perimeter Fencing Project
Active
2025-04-09
4 days remaining
The projChainlink fencing required for the Walmart store located at 9701 78 St, Peace River, AB T8S 2A1.ect at Franklin Road Elementary School, Hamilton, ON, involves renovating the music room, corridors, and nine student/staff washrooms. Scope includes installing acoustic ceilings, LED lighting, ceramic tile finishes (1,800 mm high), plumbing upgrades, asbestos abatement (e.g., transite ceiling tiles), and mechanical/electrical system coordination (fire alarms, CAT6 cabling). Work is phased over three stages (June 2025–April 2026), with strict adherence to safety protocols, and pre-qualified subcontractors (abatement, data cabling).
HWDSB - Westdale Secondary School Changeroom Renovation
Active
2025-04-15
10 days remaining
Renovation of changerooms at Westdale Secondary School at 700 Main St W, Hamilton, ON L8S 1A5. The project involves constructing two student group changerooms, three single-occupant changerooms, and a staff room in the basement, along with related mechanical, electrical, and structural work, including demolition, plumbing, and finishes. Key milestones include a site walkthrough on April 3, 2025, tender submission by April 15, 2025, and construction from June 30 to December 12, 2025.
Walmart - 1025 Matane - Exterior Painting
Active
2025-04-17
12 days remaining
Exterior painting project located at 150 Rue Piuze, Matane, QC G4W 4T2. The work includes exterior painting, signage replacement (supplied by Pattison ID), roof cap flashing (by Walmart-approved roofing contractor), and caulking. Work on stucco canopy above the main entrance to be done after store hours.
Peel Living - Interior Renovations at Various Peel Living Residential Properties
Active
2025-04-17
12 days remaining
Project involves the interior renovations of three residential properties (Bella Vista Place, Mason’s Landing, and Walker Road). The scope includes renovating common areas such as lobbies, corridors, stairwells, and garbage rooms by replacing flooring and wall tiles, repainting surfaces, installing signage, and addressing potential asbestos/mold abatement. Substantial completion by January 31, 2026, and final completion by May 31, 2026.
Walmart RTU - Edmonton, AB
Closed
2025-04-03
Replacement of rooftop units at the Walmart store located at Northgate Center, 9499 137 Ave NW, Edmonton, AB T5E 5R8. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be completed after store hours.
Walmart RTU - Selkirk, MB
Closed
2025-04-03
Replacement of rooftop units at the Walmart store located at 1016 Manitoba Ave, Selkirk, MB R1A 4M1. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be completed after store hours.
Walmart RTU - Powell River, BC
Closed
2025-04-03
Replacement of rooftop units at the Walmart store located at 1. 7100 Alberni St, Powell River, BC V8A 3G7. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be completed after store hours.
Walmart RTU - Grand-Sault, NB
Closed
2025-04-01
Replacement of rooftop units at the Walmart store located at 494 Chem. Madawaska, Grand-Sault, NB E3Y 1A3. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be completed after store hours.
Walmart RTU - Antigonish, NS
Closed
2025-04-01
Replacement of rooftop units at the Walmart store located at 50 Market St, Antigonish, NS B2G 3B4. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be completed after store hours.
Walmart RTU - Gatineau, QC
Closed
2025-04-01
Replacement of rooftop units at the Walmart store located at 425 Boulevard Saint-Joseph #1, Gatineau, QC J8Y 3Z9. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be completed after store hours.
Walmart RTU - Quebec City, QC
Closed
2025-04-01
Replacement of rooftop units at the Walmart store located at 1700 Bd Lebourgneuf, Québec, QC G2K 2M4. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be completed after store hours.
Colliers - Watermain and Piping
Closed
2025-03-28
The project involves the renovation of the music room and replacement of exterior doors at Lisgar Elementary School (110 Anson Avenue, Hamilton, ON). Scope includes demolition and installation of two sets of double HM doors (D6/D7), music room upgrades (new flooring, LED lighting, millwork with deep sink, instrument storage, painting, teaching wall, plumbing fixtures, and cooling units), and hazardous material abatement. Work must comply with strict timelines (June 30 – August 22, 2025), adhere to City of Hamilton noise bylaws, and utilize pre-qualified subcontractors for abatement, AV, and data cabling.
HWDSB - Lisgar Music Room and Exterior Door Project
Closed
2025-03-27
The project involves the renovation of the music room and replacement of exterior doors at Lisgar Elementary School (110 Anson Avenue, Hamilton, ON). Scope includes demolition and installation of two sets of double HM doors (D6/D7), music room upgrades (new flooring, LED lighting, millwork with deep sink, instrument storage, painting, teaching wall, plumbing fixtures, and cooling units), and hazardous material abatement. Work must comply with strict timelines (June 30 – August 22, 2025), adhere to City of Hamilton noise bylaws, and utilize pre-qualified subcontractors for abatement, AV, and data cabling.
HWDSB - Franklin Road Music Room and Washroom Project
Closed
2025-03-26
The project at Franklin Road Elementary School, Hamilton, ON, involves renovating the music room, corridors, and nine student/staff washrooms. Scope includes installing acoustic ceilings, LED lighting, ceramic tile finishes (1,800 mm high), plumbing upgrades, asbestos abatement (e.g., transite ceiling tiles), and mechanical/electrical system coordination (fire alarms, CAT6 cabling). Work is phased over three stages (June 2025–April 2026), with strict adherence to safety protocols, and pre-qualified subcontractors (abatement, data cabling).
Walmart - 1028 Drumheller - Exterior Painting
Closed
2025-03-26
Exterior painting project located at 1801 S Railway Ave, Drumheller, AB T0J 0Y0. The work includes exterior painting, signage replacement (supplied by Pattison ID), roof cap flashing (by Walmart-approved roofing contractor), and caulking. Work on stucco canopy above the main entrance to be done after store hours.
HWDSB - Hess Street Elementary Floor and RTU
Closed
2025-03-21
Project description...
HWDSB - Lisgar Elen School Music Rm Reno & Exterior Door Replacement
Closed
2025-03-20
Project description...
(GWNCC) Haldimand County - replace and Repair Concrete Curb, Sidewalk and Catchbasiins
Closed
2025-03-18
Project description...
Cavalieri -Self Storage - 7845 Hwy 27 Phase 2
Closed
2025-03-11
Project description...
Walmart - FY26 Parking Lot (ON)
Closed
2025-03-11
Project description...
GTAA Project 14062 New Offices
Closed
2025-03-10
Project description...